We have recently carried out remedial works at the Town Quay complex at Southampton port for the Associated British Ports.
The work was to replace the obsolete 8100e air sampling units with new VEP units to continue providing fire protection to the complex as part of a wider refurbishment of the unit.
All new power supplies were installed for the new air sampling units and existing pipework was adapted to suit the needs of the new equipment and layout. The finished product ensured the complex had an upgraded and resilient air sampling system to continue providing vital life safety protection to the building.