Select Page
Renewing the Electrics for King George V Memorial Clock Tower, Poole

Client: Borough of Poole

Location: Poole

Description of Work: Electrical Rewiring

Background:

The King George V memorial clock tower is built of Portland Stone and located opposite the Civic Centre in the Borough of Poole, Dorset.

Scope:

Wessex Electricals was instructed to renew the electrics inside the memorial clock tower. Ian Struijs, Wessex’s Health and Safety Advisor visited the site with our Contracts Manager Tony Holloway to assess the health and safety of the site. To enter the clock mechanism, you have to go through a small, confined space through the plaque at the base of the clock. Inside there is wooden staging for support with a 6ft drop to the floor. As well as the rewiring it was discovered that the wooden stage was rotting and needed replacing, which Wessex offered to replace.

The heat inside the clock also caused a problem as there was no air flow, so they had to work in 10 minute intervals to ensure they didn’t collapse from the heat! Our engineer was supported by two other Electricians to ensure help was on hand in should there have been an emergency, and radio communication was used as an extra safety measure. Toxic gas monitors were also used whilst working inside the clock to ensure extra safety.

Get in touch

Wessex Group

Longmead Industrial Estate,
Wincombe Lane,
Shaftesbury,
SP7 8PJ

Get directions

k

Contact Form































    Please tick your preferred contact method:


    Protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.